Maintenance to Linn Cove Viaduct….

Linn Cove Viaduct was a specific destination in our motorcycle journeys in May. Looks like it will be going under maintenance. hmm

(Blowing Rock, NC) – The National Park Service announces the closure of the Linn Cove Viaduct on the Blue Ridge Parkway for surface repaving and bridge maintenance from March 1, 2018 through May 24, 2018. These projects require a full closure of the Parkway, including closure of the trail below the bridge; with the reopening coinciding with Memorial Day weekend. The Linn Cove Viaduct is located at Milepost 304.

A traffic detour will be put in place from Milepost 298.6 (Holloway Mountain Rd) to Milepost 305.1 (US 221). Gates will be located at MP 303.6, Wilson Creek Overlook on the north and MP 305.1, US 221 on the south end of the work zone. Within the closed area, including the trail areas beneath the viaduct, the Parkway will be closed to all uses including motorists, cyclists, and pedestrians. The public’s cooperation with these closures will provide for the most efficient work schedule and will ensure the safety of staff and visitors.

During the closure, crews will remove and replace the asphalt pavement, waterproofing membrane and joints on the bridge. Repairs to the supporting structure, stone curb, railing and drainage features will also be made.

http://wataugaonline.com/iconic-linn-cove-viaduct-receive-facelift-upcoming-closure/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s